MCT Pharmaceutical Cosmetics Production Facility

MCT Pharmaceutical Cosmetics Production Facility

2022–2023
Kocaeli / Karamürsel
MCT Pharmaceuticals Cosmetics

Project Summary

Envora Global, in collaboration with its partner ELİKSİR, has undertaken project management and implementation activities for MCT Pharmaceuticals Cosmetics in a project conducted between 2022–2023 at the Kocaeli / Karamürsel location. The project area is stated to be 700 m² in the presentation. The main topics of the scope include concept design and implementation of cosmetic production facility, GMP training and documentation, and liquid and semi-solid forms. In addition, topics such as DI water, HVAC and clean room applications, infrastructure systems, audit preparation, and cosmetic GMP training have also been included in the project scope. The project is among the reference projects completed jointly by Envora Global and ELİKSİR.

MCT Pharmaceutical Cosmetics / Elixir Partnership

This project, carried out at the Kocaeli / Karamürsel location, has been implemented as a joint effort between Envora Global and its partner ELIXIR for project management and execution. The project area is presented as 700 m² in the presentation. This work is one of Envora Global’s cosmetic production facility references in Kocaeli.

The focus of the collaboration included concept design and implementation of the cosmetic production facility, GMP training and documentation, liquid and semi-solid forms, DI water, HVAC and clean room applications, infrastructure systems, audit preparedness, and cosmetic GMP training. The project was completed between 2022 and 2023.

If you are planning a cosmetic production facility in Kocaeli or a similar facility project, contact Envora Global; let’s evaluate your needs together. You can also check out our other cosmetic production facilities and GMP compliant production areas projects.

Project Scope

Concept design and implementation of cosmetic production facility
GMP training and documentation
Liquid and semi-solid forms
DI water, HVAC and clean room applications
Infrastructure systems
Audit preparation
Cosmetic GMP training

Project Results

Project Area
700 m²
Service Type
Project management and implementation
Production Scope
Cosmetic
Compliance Standard
GMP
Project Status
Completed (2023)

Customer

MCT Pharmaceuticals Cosmetics

Catalog

You can review our catalogs for detailed information about our products and services.