This modern wastewater treatment plant built in Arcman plays a critical role in the environmental sustainability of the region with its expansive layout, organized infrastructure, and high-capacity process units. As clearly seen in the visuals, the facility has a fully integrated structure with sedimentation ponds, biological treatment units, sludge management areas, and operational buildings. Thanks to cutting-edge treatment processes, it effectively treats 20,000 m³ of wastewater daily, contributing to the protection of underground water sources and the sustainability of the ecosystem. Designed with extensive landscaping, organized road and entry structures, modern control centers, and an efficient layout, the facility is intended to provide uninterrupted service for many years to meet the region’s growing water treatment needs. This infrastructure both elevates environmental standards and ensures safe water management for the region’s industrial and residential areas.
Turkmenistan Arcman – Wastewater Treatment Plant
2022
Turkmenistan / Arçman
Turkmenistan Presidency - Water Administration
Project Summary
The facility built in Arçman helps protect the region's water resources by treating 20,000 m³ of wastewater daily with state-of-the-art purification processes.
Project Visuals
Project Scope
Project Results
Daily Water Treatment
20,000 m³
Customer
Turkmenistan Presidency - Water Administration
Catalog
You can review our catalogs for detailed information about our products and services.